Phase-by-Phase Timeline
- Emergency response (Day 1): Arrival within 45 minutes, water extraction, initial assessment, equipment setup
- Structural drying (Days 1–5): Industrial dehumidifiers and air movers run continuously; daily moisture readings track progress
- Mold prevention monitoring (Days 3–10): Moisture levels verified below 15% in all materials before reconstruction begins
- Reconstruction (Days 5–21+): Drywall, flooring, painting, and finishing work
Typical Timelines by Damage Type
- Minor (single room, clean water): 3–7 days total
- Moderate (multiple rooms or contaminated water): 1–2 weeks
- Major (whole floor, structural damage): 2–4 weeks
- Severe (multiple floors, Category 3): 4–8 weeks
Factors That Affect Timeline
- Water category: contaminated water requires additional sanitization steps
- Materials affected: concrete dries faster than wood
- Extent of damage: one room vs. multiple floors
- Insurance approval: reconstruction typically begins after adjuster approval